Saab 9-5

Since 1997 of release

Repair and car operation



Saab 9-5
+ Cars Saab 9-5
+ Controls and operation receptions
+ Options and car routine maintenance
+ The engine
+ Systems of cooling of the engine, heating, ventilation and air conditioning
+ The power supply system and release of the fulfilled gases
- Systems of an electric equipment of the engine
   + Systems of ignition, preheat and engine management
   + Diagnostics of systems of electronic control and the diagnostic equipment
   - Charge and start systems
      The general information
      The storage battery - the general information, recommendations about service
      Charge system - the general data and security measures
      Removal and generator installation
      Replacement of the block of the rectifier of pressure and generator brushes
      System of start of the engine - the general information and safety measures
      Removal and starter installation
+ Manual box of a gear change
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


Богатый выбор ПНД в Новосибирске на сайте tpkploshadka.ru

Removal and starter installation

4-cylinder engines

 PERFORMANCE ORDER

    Disconnect a negative wire from the storage battery and remove the top casing of the inlet pipeline.
    Turn out the top bolt of a starter (3 on an illustration) and disconnect from it electroconducting (4).
    Поддомкратьте the car also cut a bandage tape (6) traction relays. Turn out the bottom nut (7) and remove a starter. Installation is made upside-down.

Petrol engines V6

 PERFORMANCE ORDER

    Remove the generator (see Has undressed Removal and generator installation) and disconnect electroconducting from a starter (3 on an illustration).
    Turn out the top bolt of fastening of a starter (4).

It is the most convenient to make it through the right wheel arch by means of the key extension piece.

    Turn out the bottom bolt (5) and remove a starter (6). Installation is made upside-down.

The diesel engine

 PERFORMANCE ORDER

    Remove the bottom support of the engine (the Engine see the Head).
    Disconnect generator electroconducting (2 on an illustration) and a starter (3).
    Give fixture (4) starters and, having removed the engine from a stretcher by means of a wedge established between them, remove a starter. Installation is made upside-down.