Saab 9-5

Since 1997 of release

Repair and car operation



Saab 9-5
+ Cars Saab 9-5
+ Controls and operation receptions
+ Options and car routine maintenance
- The engine
   The general information and preparatory operations
   Check компрессионного pressure
   Check of the engine by means of the vacuum gauge
   - Repair of 4-cylinder petrol engines
      Reduction of the piston of the first cylinder in position of the top dead point (ВМТ)
      Removal and installation of a head of cylinders and натяжителя приводной chains
      Removal and installation of camshafts and valves, estimation клапанных backlashes
      Check and replacement приводной chains
      Replacement of a belt of a drive of auxiliary units
      Replacement of epiploons and pulley of a cranked shaft
      Replacement of the oil pump
      Removal and pallet installation картера
      Removal and installation of an arm of the filter, the thermostat and редукционного the valve of system of greasing of the engine
      Check of pressure of impellent oil
      Removal and installation of the power unit
      Removal and installation of a cover of drive ГРМ
      Check and replacement of a chain of a drive of balancing shaft and their asterisks
   + Repair of 6-cylinder petrol engines
   + Repair of 6-cylinder diesel engines
+ Systems of cooling of the engine, heating, ventilation and air conditioning
+ The power supply system and release of the fulfilled gases
+ Systems of an electric equipment of the engine
+ Manual box of a gear change
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


кровмаркет

Check and replacement приводной chains

Check

 PERFORMANCE ORDER

    Поддомкратьте the car also establish it on props. Remove the bottom cover of a belt of a drive of auxiliary units.
    Lower the car on the earth and remove a decorative cover of the engine and a spark plug (the Section Check and replacement of spark plugs and the ignition module see). Remove a hose and a ventilation tube картера. Cut off a cable coupler on the control valve. Separate a socket э/м the valve and uncover heads of cylinders. Establish the piston of the first cylinder in position ВМТ of the end of a step of compression (see Has undressed Reduction of the piston of the first cylinder in position of the top dead point (ВМТ)). Loosen the a tension of a belt of a drive of auxiliary units also give an intermediate gear wheel so that to release муфту натяжителя chains. Turn out a stopper натяжителя, remove a spring and a pusher then remove натяжитель, without changing position of pistons.
    The acting part натяжителя should not exceed 15 mm, otherwise a chain it is necessary to replace.
    Check up deterioration of asterisks and directing to a chain. If on a surface between external edges of the directing there are deterioration signs, replace натяжители together with a chain.

Replacement

 PERFORMANCE ORDER

    Cover area round a chain on asterisks of camshafts rags and fix a chain plastic collars. Break off a chain, having removed by means of the special adaptation a folding link. Fix a plastic collar on the end of an old chain.
    Connect a new chain to the old.

Do not suppose chain falling. Make sure that the new chain lies on an asterisk of an inlet camshaft.


    Establish on a chain keeping adaptation and clean rags and collars from asterisks.
    Ask the assistant to turn a cranked shaft (clockwise) and, keeping an old chain, stack a new chain on asterisks of a cranked shaft.

Hold an old chain strained that it has not developed on cranked to a shaft.


    When the new chain will be established on asterisks so that on an asterisk of an inlet camshaft there will be only a few links, again lay round it rags. Fix a new chain a collar, remove a folding link and disconnect an old chain.
    Connect a new chain a connecting link, clean a collar and rags and stretch a chain so that this link has risen on the centre of the keeping adaptation. Condense an aperture with rags, remove a connecting link and will put the new lock of a chain. Check up that the insert with number 2 is in the special adaptation, then place in it a plate of a connecting link and establish it on a link in a chain, having pressed with effort 10 Nm. Turn an insert in the special adaptation and place its V-shaped dredging directly on one of шенкелей on a link. Rivet шенкель with effort 15 Nm. Then repeat this operation on other шенкеле. Check up diameter compressed together шенкелей – it should make 3.4 - 3.6 mm. Remove rags and keeping adaptation. The further installation is made upside-down. Tighten fixture with demanded efforts. Use a new sealing ring натяжителя chains.