Saab 9-5

Since 1997 of release

Repair and car operation



Saab 9-5
+ Cars Saab 9-5
+ Controls and operation receptions
+ Options and car routine maintenance
+ The engine
+ Systems of cooling of the engine, heating, ventilation and air conditioning
+ The power supply system and release of the fulfilled gases
- Systems of an electric equipment of the engine
   - Systems of ignition, preheat and engine management
      The basic data and security measures
      Search of malfunctions - the general information and preliminary checks
      Removal and installation ECM
      Candles and modules of ignition of petrol engines
      Removal and installation of components of system of preheat of the diesel engine
      Removal and installation of gauges of a control system by the engine
   + Diagnostics of systems of electronic control and the diagnostic equipment
   + Charge and start systems
+ Manual box of a gear change
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


Removal and installation ECM

 PERFORMANCE ORDER

    Remove обтекатель a windscreen (the Body see the Head).
    Remove a protective cover (7 on an illustration) ECM and separate its socket (8).
    Turn out 2 nuts (9 on an illustration) fastenings ECM and remove it (10). Installation is made upside-down.