Saab 9-5
+ Cars Saab 9-5
+ Controls and operation receptions
+ Options and car routine maintenance
+ The engine
+ Systems of cooling of the engine, heating, ventilation and air conditioning
+ The power supply system and release of the fulfilled gases
+ Systems of an electric equipment of the engine
+ Manual box of a gear change
- Automatic transmission
The general information
Search of malfunctions - the general information
Removal and installation of assemblage of the lever of the selector of modes АТ and its casing
Removal, installation and adjustment of a cable of the selector of modes АТ
Removal and installation of the lever of the selector of modes АТ and dismantling of its casing
Removal and installation э/м valves AT, their case and its cover
Removal and installation of gauges of speed
Removal and installation of hydraulic lines АТ
Removal and installation TCM
Replacement and adjustment of the gauge of position of the selector of modes АТ
Removal and installation АТ
Replacement of epiploons of power shafts
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
|
Removal and installation э/м valves AT, their case and its cover
|
Valves of management of pressure and blocking are not subject to replacement. More low приводнится the description on example АТ AF33-5. |
|
Поддомкратьте the car also establish it on props.
|
Remove from an arm a support (2) and a wire of weight (3) then give bolts (4) fastenings of an arm and remove it. Disconnect hoses маслоохладителя (5).
|
|
Prepare for gathering of the oil following from hoses. After removal of hoses закупорьте them. |
|
Turn out bolts (6) fastenings of a cover клапанной assemblages and uncover (7), having brought down its hammer with rubber the brisk.
|
Separate a socket replaced э/м the valve of switching (2), turn out a bolt of its fastening (3), and remove the valve.
|
Removal э/м valves of switching АТ AF33-5. |
|
Removal э/м valves of switching АТ AF30. |
At removal клапанной assemblages separate sockets all (2) э/м valves, and also the gauge of temperature ATF. Turn out bolts (3) fastenings клапанной assemblages.
|
Sockets э/м valves and the gauge of temperature ATF, fastening bolts клапанной assemblages (AF33-5). |
|
Sockets э/м valves and the gauge of temperature ATF, fastening bolts клапанной assemblages (AF30). |
|
Fastening bolts клапанной have assemblages different length. |
Accurately disconnect the valve (4) hand control from the lever of the selector and remove клапанную assemblage.
|
Do not lose two sealing rings клапанной assemblage. |
Installation is made upside-down.
|
Before cover installation clear it and remove from it the rests sealing materials then put on its interfaced surfaces a strip of hermetic in the thickness of 1 mm. A carving of bolts of fastening of a cover process fixing hermetic. |
In conclusion of installation check up level ATF and if necessary modify it (see the Head of Adjustment and car routine maintenance).
|
|
|
|