Saab 9-5

Since 1997 of release

Repair and car operation



Saab 9-5
+ Cars Saab 9-5
+ Controls and operation receptions
+ Options and car routine maintenance
+ The engine
+ Systems of cooling of the engine, heating, ventilation and air conditioning
- The power supply system and release of the fulfilled gases
   The general data and security measures
   Sbrasyvanie pressure in fuel system
   - The power supply system of petrol engines
      Principle of functioning of a control system of fuel injection
      Removal and installation of a sleeve of an air inlet and the case of the air filter
      Removal and installation of gauges MAF, MAP, IAT and the gauge of temperature/pressure of air of pressurisation
      Removal and installation of a tube of forced air
      Removal and installation of the case of a throttle
      Removal and installation of the control valve of forced air
      Removal and installation перепускного the valve турбокомпрессора
      Removal and installation турбокомпрессора
      Removal and installation интеркулера
      Removal and installation of a pedal of gas, adjustment of a cable of a drive throttle заслонки
      Removal and installation of a fuel tank
      Replacement of the fuel filter
      Removal and installation of assemblage of the fuel pump and the gauge of a stock of fuel
      Removal and installation of a fuel distributive highway and injectors
      Removal and installation of a regulator of pressure of fuel
   + The power supply system of diesel engine V6
   + Systems of release and decrease in toxicity of the fulfilled gases
+ Systems of an electric equipment of the engine
+ Manual box of a gear change
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


Removal and installation of a fuel distributive highway and injectors

At work with a fuel distributive highway and injectors observe exclusive cleanliness.


 PERFORMANCE ORDER

    Remove the top cover of the engine. At the working engine take a safety lock №19 and after an engine stop turn the ignition key in position OFF.

4-cylinder engines of 2.3 l

 PERFORMANCE ORDER

    Remove a ventilation hose картера (3 on an illustration), remove щуп level of impellent oil with a cover маслозаливной mouths (4).
    Remove a protective casing and disconnect a cable of a drive throttle заслонки (5 on an illustration).
    Separate sockets of injectors, the module of ignition, the gauge of absolute pressure, gauge MAF and the gauge of pressure of pressurisation (6 on an illustration).
    Loosen the the top bolt (7 on an illustration) the holder of electroconducting, then the bottom bolts (8) then raise the holder and shift it back (9). Loosen the connections of fuel lines (11 on an illustration) also clear area round injectors the compressed air.
    Disconnect a vacuum hose of a regulator of pressure of fuel (13 on an illustration) and turn out 2 bolts of fastening of a fuel distributive highway.
    Accurately separate a fuel distributive highway, having raised it by means of two wedges, and then remove definitively. Installation is made upside-down. Sealing rings of injectors grease безкислотным with vaseline. After installation adjust a cable of a drive throttle заслонки (see Has undressed Removal and installation of drop of gas, adjustment of a cable of a drive throttle заслонки).

4-cylinder engines of 2.0 l

 PERFORMANCE ORDER

    Remove a ventilation hose картера (3 on an illustration), remove щуп level of impellent oil with a cover маслозаливной mouths (4).
    Disconnect a cable of a drive throttle заслонки together with its holder. Turn out a bolt of fastening of a submitting tube турбокомпрессора to a head of cylinders, ослабьте collars and lift the receiver. Turn out the top forward bolt of fastening of the holder of electroconducting about an elevating eye of the engine, then turn out a back bolt, lift the holder and shift it back.
    Separate sockets of injectors, the module of ignition, the gauge of absolute pressure, the control valve of pressure of pressurisation and the gauge of pressure of pressurisation.
    Liberate electroconducting from couplers and clamps and shift it aside. Clear area round injectors the compressed air. Operate according to item 6-8 (4-cylinder engines 2.3).

6-cylinder engines

 PERFORMANCE ORDER

    Disconnect submitting hose (3 on an illustration) турбокомпрессора, and also приводной a cable (4) from the throttle case then disconnect it from the inlet pipeline and accurately shift aside.
    Remove the top section of the inlet pipeline and закупорьте open channels to prevent hit in them a dirt (5 on an illustration).
    Disconnect from a fuel distributive highway electroconducting (6 on an illustration), remove fuel lines (7) and disconnect a vacuum hose of a regulator of pressure of fuel (8). Clear area round injectors the compressed air, turn out bolts of fastening of a fuel distributive highway and remove it together with injectors. Installation is made upside-down. Sealing rings of injectors grease безкислотным with vaseline. After installation adjust a cable of a drive throttle заслонки (see Has undressed Removal and installation of drop of gas, adjustment of a cable of a drive throttle заслонки).