Saab 9-5
+ Cars Saab 9-5
+ Controls and operation receptions
+ Options and car routine maintenance
+ The engine
- Systems of cooling of the engine, heating, ventilation and air conditioning
+ System of cooling of the engine
- Systems of heating, ventilation and air conditioning
The general information
Removal and installation of the block of management by system of ventilation from a heater and К/В, removal and installation of the broad valve
Valve replacement отсечки a cooling liquid and it э/м the valve
Removal and installation of the fan of a heater
Removal and heat exchanger installation
Removal, repair and compressor K/V installation
Removal and installation of the gauge of temperature in salon
Removal and installation of the step-by-step engine заслонки air and e/motor mixing заслонки an air circulation mode
+ The power supply system and release of the fulfilled gases
+ Systems of an electric equipment of the engine
+ Manual box of a gear change
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
|
Valve replacement отсечки a cooling liquid and it э/м the valve
|
The given valves are riveted with each other. |
|
Uncover a broad tank and dump pressure in system. Substitute under the car capacity for gathering ОЖ.
|
Press water hoses (3 on an illustration) and disconnect from valves vacuum hoses (4).
|
|
Check up at the same time a condition of hoses. |
Separate a socket (5 on an illustration) э/м the valve and cut the cable coupler (6) keeping together э/м the valve and electroconducting.
|
Remove collars (7 on an illustration) fastenings of hoses to э/м to the valve and drill rivets (9).
|
Replace the valve отсечки or it э/м the valve.
Installation is made upside-down. Instead of rivets use болтовое connection.
|
|
|
|