Saab 9-5

Since 1997 of release

Repair and car operation



Saab 9-5
+ Cars Saab 9-5
+ Controls and operation receptions
+ Options and car routine maintenance
+ The engine
- Systems of cooling of the engine, heating, ventilation and air conditioning
   + System of cooling of the engine
   - Systems of heating, ventilation and air conditioning
      The general information
      Removal and installation of the block of management by system of ventilation from a heater and К/В, removal and installation of the broad valve
      Valve replacement отсечки a cooling liquid and it э/м the valve
      Removal and installation of the fan of a heater
      Removal and heat exchanger installation
      Removal, repair and compressor K/V installation
      Removal and installation of the gauge of temperature in salon
      Removal and installation of the step-by-step engine заслонки air and e/motor mixing заслонки an air circulation mode
+ The power supply system and release of the fulfilled gases
+ Systems of an electric equipment of the engine
+ Manual box of a gear change
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


Removal and heat exchanger installation

 PERFORMANCE ORDER

    Disconnect from the engine heat exchanger hoses. Submit through an aperture in a head of cylinders the compressed air to empty the heat exchanger.
Purge of a liquid of the heat exchanger of 4-cylinder petrol engines.
Purge of a liquid of the heat exchanger of petrol engines V6.
    Remove the main ware box and a lateral part of furnish of the central console of the panel of devices.
    Remove from an air line the gate.

Do not remove an epiploon.


    Separate a socket of tubes of the heat exchanger.
    Turn out 4 bolts and remove the heat exchanger. Installation is made upside-down. Use new consolidations.