Saab 9-5

Since 1997 of release

Repair and car operation



Saab 9-5
+ Cars Saab 9-5
+ Controls and operation receptions
+ Options and car routine maintenance
+ The engine
+ Systems of cooling of the engine, heating, ventilation and air conditioning
- The power supply system and release of the fulfilled gases
   The general data and security measures
   Sbrasyvanie pressure in fuel system
   + The power supply system of petrol engines
   + The power supply system of diesel engine V6
   - Systems of release and decrease in toxicity of the fulfilled gases
      The general information
      Removal and installation of components of system of release ОГ
      Removal and installation of ljambda-probes
      Removal and installation of components of system SAI
      Removal and installation of components of system EVAP
      Removal and installation of the valve and system EGR tube
+ Systems of an electric equipment of the engine
+ Manual box of a gear change
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


Removal and installation of components of system SAI

The forward valve and forward submitting tube SAI

 PERFORMANCE ORDER

    Remove the top cover of the engine (1 on an illustration) and перепускную a tube with the valve (2).
    Separate a socket of the gauge of temperature/pressure (3 on an illustration), disconnect a tube турбокомпрессора from the case of a throttle (4), then поддомкратьте the car and disconnect a tube from интеркулера (5). Lower the car on the earth and lift the receiver турбокомпрессора.
    Loosen the a collar (7 on an illustration) hose fastenings to valve SAI and if it is required to remove only the valve, turn out bolts (8) its fastenings.

The valve can be removed and after tube removal.

    At tube removal give fixture of a thermofilter of a final collector and remove the screen.
    Give fixture of a submitting tube to a forward final collector (3 bolts) and a head of cylinders (1 nut) and lift the receiver (11 on an illustration).
    If forward valve SAI is not removed yet, remove it, having turned out bolts (12 on an illustration). Installation is made upside-down. Preliminary clear interfaced surfaces of the valve and a tube, use new linings.

The back valve and back submitting tube SAI

 PERFORMANCE ORDER

    Separate sockets of ljambda-probes (see an illustration).
    Give fixture (2 on an illustration) back tube SAI to a final collector and a head of cylinders.
    Disconnect from valve SAI a hose (3 on an illustration) and lift the receiver together with the valve. Turn out bolts (4 on an illustration) fastenings of the valve and separate it from a tube. Installation is made upside-down. Preliminary clear interfaced surfaces of the valve and a tube, use new linings.

Pump SAI

 PERFORMANCE ORDER

    Поддомкратьте the car also separate a socket of electroconducting of pump SAI (2 on an illustration).
    Turn out bolts of fastening of pump SAI, disconnect from it hoses and remove the pump (3 on an illustration). Installation is made upside-down. Be convinced that plugs of fixing apertures of the pump are established correctly and do not drop out.

Filter SAI

 PERFORMANCE ORDER

    Remove pump SAI and the filter case (3 on an illustration).
    Remove the filter (4 on an illustration). Installation is made upside-down.