Saab 9-5

Since 1997 of release

Repair and car operation



Saab 9-5
+ Cars Saab 9-5
+ Controls and operation receptions
+ Options and car routine maintenance
+ The engine
+ Systems of cooling of the engine, heating, ventilation and air conditioning
- The power supply system and release of the fulfilled gases
   The general data and security measures
   Sbrasyvanie pressure in fuel system
   + The power supply system of petrol engines
   + The power supply system of diesel engine V6
   - Systems of release and decrease in toxicity of the fulfilled gases
      The general information
      Removal and installation of components of system of release ОГ
      Removal and installation of ljambda-probes
      Removal and installation of components of system SAI
      Removal and installation of components of system EVAP
      Removal and installation of the valve and system EGR tube
+ Systems of an electric equipment of the engine
+ Manual box of a gear change
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


Removal and installation of components of system EVAP

The gauge of pressure of steams of fuel

 PERFORMANCE ORDER

    Remove a fuel tank and clear area round the pressure gauge the compressed air.
    Turn out the screw of fastening of the gauge, disconnect from it electroconducting and remove the gauge.
    Installation is made upside-down. Preliminary make sure of cleanliness of interfaced surfaces and grease a sealing ring of the gauge безкислотным with vaseline.

Adsorber

 PERFORMANCE ORDER

    Remove a fuel tank.
    Disconnect from an adsorber a line of a purge and a valve hose отсечки (2 on an illustration).
    Disconnect lines from a fuel tank to an absorber (3 on an illustration). For this purpose at first press a socket in a direction to an absorber (a), then compress clamp pads (b) and disconnect a hose (). By means of the special adaptation ослабьте a hose of a purge of an adsorber. Give fixture (5 on an illustration) and remove an adsorber. Installation is made upside-down. Watch correctness and reliability of connection of hoses.

The valve отсечки

 PERFORMANCE ORDER

    Поддомкратьте the car, cut a cable coupler (2 on an illustration), separate and remove a socket (3) devices of a purge.
    By means of a screw-driver disconnect the device of a purge from an arm of a jellied tube (4 on an illustration). Clear the purge device. Remove the top cover of the valve отсечки (6 on an illustration).
    Separate a valve socket отсечки and remove a washer (7 on an illustration).
    Shift a cover (8 on an illustration) so that to provide access to a collar (9), ослабьте a collar and remove the valve. Installation is made upside-down.

The valve of a purge of an adsorber

 PERFORMANCE ORDER

    Loosen the quick disconnect connection of a hose of a purge of an adsorber (1 on illustrations) also remove the valve of a purge (2) from an arm.
Removal of the valve of a purge on petrol engines V6.
    Accurately turn the valve and separate its socket (3 on illustrations) then disconnect the valve from a hose (4). Installation is made upside-down.