   The general information
   + Coupling
   - Power shafts
      Removal and installation of power shafts
      Dismantling, assemblage and cleaning of hinges of power shafts
      Removal and installation of an intermediate shaft and its bearing
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


Power shafts

Removal and installation of power shafts

 PERFORMANCE ORDER

    Поддомкратьте the car also remove a corresponding wheel and the left lateral protective casing. On diesel models V6 remove the bottom protective casing of the engine. Remove a cap ступичной nuts and give it. At removal of the right power shaft give fixture of an arm of the gauge of an inclination of headlights (at a corresponding complete set) and take him aside. Turn out a bolt of fastening of a spherical support to a rotary fist and lower the suspension bracket lever, having fixed it in this position wooden бруском, established between the lever and a stabilizer rack. Loosen the a collar of a brake hose and fixture of electroconducting ABS. Beat out an external SHRUS from a nave by means of a hammer with soft the brisk. For simplification of removal of a shaft delay a suspension bracket rack.

Do not damage шлицы a shaft.

    At removal of the left power shaft accurately hook the lever an internal SHRUS and deduce it from transmission.

Thus oil will follow from transmission.

    For removal of the right power shaft beat out it from an intermediate shaft a hammer with soft the brisk.

The internal SHRUS of the right power shaft on шлицах has the lock ring established in a flute for fixing with intermediate shaft.

    Before installation of the left power shaft replace its epiploon (the Manual box of a gear change see the Head). Be convinced of integrity and correctness of installation of lock rings in their flutes, and also in cleanliness шлицов an established shaft. Establish a shaft in a nave, having delayed a suspension bracket rack. Grease шлицы the internal end of a shaft трансмиссионным with oil and establish a shaft in transmission / an intermediate shaft to защёлкивания a lock ring. The further installation is made in an order, the return to an order of dismantle of components. Use new hub a nut.