Saab 9-5

Since 1997 of release

Repair and car operation



Saab 9-5
+ Cars Saab 9-5
+ Controls and operation receptions
+ Options and car routine maintenance
+ The engine
+ Systems of cooling of the engine, heating, ventilation and air conditioning
- The power supply system and release of the fulfilled gases
   The general data and security measures
   Sbrasyvanie pressure in fuel system
   + The power supply system of petrol engines
   - The power supply system of diesel engine V6
      The general information
      Removal and installation of a sleeve of an air inlet, the case of the air filter and gauge MAF
      Removal and installation of the inlet pipeline
      Replacement of the gauge of position of a pedal of gas
      Replacement of gauges of a turbo-supercharging and the gauge of temperature of fuel
      Replacement of the valve of management with pressure of pressurisation
      Removal and installation турбокомпрессора
      Removal and installation интеркулера
      Removal and installation of a fuel tank
      Replacement of the fuel filter
      Removal and installation of a fuel distributive highway
      Removal and installation of the gauge of a stock of fuel
      Removal and installation ТНВД and replacement of its epiploon
      Removal and installation of atomizers
   + Systems of release and decrease in toxicity of the fulfilled gases
+ Systems of an electric equipment of the engine
+ Manual box of a gear change
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


Removal and installation ТНВД and replacement of its epiploon

 PERFORMANCE ORDER

    Поддомкратьте the car also remove the bottom protective casing of an impellent compartment. Loosen the a tension of a belt of a drive of auxiliary units also remove it натяжитель (the Engine see the Head). Give a forward bolt of a forward support of the power unit. Lower the car and remove submitting tube from турбокомпрессора (1 and 2 on an illustration). Remove the top cover of the engine.
    Give quick disconnect connections of fuel lines (7 on an illustration), unload support of the engine and remove the right support (8) together with an arm and a pillow. Slightly raise the engine to take bolts.
    Remove a belt of a drive of auxiliary units and its intermediate pulley (the Engine see the Head). Remove top section of the inlet pipeline and a fuel distributive highway with tubes (see Has undressed Removal and installation of the inlet pipeline). Remove cogwheel ТНВД, a pulley of a cranked shaft and an intermediate pulley (the Engine see the Head).
    Uncover drive ТНВД.
    If necessary only replacements of epiploon ТНВД make it at the given stage.
    Remove valve EGR and a water hose.
    Remove the bottom section of the inlet pipeline from both heads of cylinders (see Has undressed Removal and installation of the inlet pipeline).
    Закупорьте an aperture in a head of cylinders also remove a ventilation hose картера. For simplification of installation and prevention of possible damages separate socket ТНВД (26 on an illustration).
    Disconnect fuel lines (27) from ТНВД.
    Turn out blocking bolt from gear wheel ТНВД and screw in it two bolts М6.
    Tighten bolts consistently, that ослабла an external part of a gear wheel. Screw bolts in apertures in an internal part of gear wheel ТНВД and remove it.
    Remove ТНВД, paying attention to an arrangement of bolts of different length.
    Installation is made upside-down. Use new lining ТНВД and new consolidations of understanding connections.