Saab 9-5

Since 1997 of release

Repair and car operation



Saab 9-5
+ Cars Saab 9-5
+ Controls and operation receptions
+ Options and car routine maintenance
+ The engine
+ Systems of cooling of the engine, heating, ventilation and air conditioning
- The power supply system and release of the fulfilled gases
   The general data and security measures
   Sbrasyvanie pressure in fuel system
   + The power supply system of petrol engines
   - The power supply system of diesel engine V6
      The general information
      Removal and installation of a sleeve of an air inlet, the case of the air filter and gauge MAF
      Removal and installation of the inlet pipeline
      Replacement of the gauge of position of a pedal of gas
      Replacement of gauges of a turbo-supercharging and the gauge of temperature of fuel
      Replacement of the valve of management with pressure of pressurisation
      Removal and installation турбокомпрессора
      Removal and installation интеркулера
      Removal and installation of a fuel tank
      Replacement of the fuel filter
      Removal and installation of a fuel distributive highway
      Removal and installation of the gauge of a stock of fuel
      Removal and installation ТНВД and replacement of its epiploon
      Removal and installation of atomizers
   + Systems of release and decrease in toxicity of the fulfilled gases
+ Systems of an electric equipment of the engine
+ Manual box of a gear change
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


Removal and installation of the inlet pipeline

 PERFORMANCE ORDER

    Disconnect submitting tube from турбокомпрессора and gauge MAF then remove the top cover of the engine.
    Separate sockets, remove the forward cable channel and shift aside engine electroconducting (3 on an illustration).
    Remove the top section of the inlet pipeline and an arm турбокомпрессора (4 on an illustration).
    Remove fuel tubes and a fuel distributive highway.
    Remove valve EGR and a water hose. Disconnect and put aside tube EGR with a water shirt, and also a tube to турбокомпрессору.
    Lift the receiver ventilation картера (7 on an illustration) and the bottom section of the inlet pipeline (8) from both blocks of cylinders.
    Installation is made upside-down. Preliminary clear interfaced surfaces and establish new linings. Besides, use new consolidations of understanding connections, and also new submitting fuel tubes.