Saab 9-5

Since 1997 of release

Repair and car operation



Saab 9-5
+ Cars Saab 9-5
+ Controls and operation receptions
+ Options and car routine maintenance
+ The engine
+ Systems of cooling of the engine, heating, ventilation and air conditioning
- The power supply system and release of the fulfilled gases
   The general data and security measures
   Sbrasyvanie pressure in fuel system
   + The power supply system of petrol engines
   - The power supply system of diesel engine V6
      The general information
      Removal and installation of a sleeve of an air inlet, the case of the air filter and gauge MAF
      Removal and installation of the inlet pipeline
      Replacement of the gauge of position of a pedal of gas
      Replacement of gauges of a turbo-supercharging and the gauge of temperature of fuel
      Replacement of the valve of management with pressure of pressurisation
      Removal and installation турбокомпрессора
      Removal and installation интеркулера
      Removal and installation of a fuel tank
      Replacement of the fuel filter
      Removal and installation of a fuel distributive highway
      Removal and installation of the gauge of a stock of fuel
      Removal and installation ТНВД and replacement of its epiploon
      Removal and installation of atomizers
   + Systems of release and decrease in toxicity of the fulfilled gases
+ Systems of an electric equipment of the engine
+ Manual box of a gear change
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


Removal and installation турбокомпрессора

 PERFORMANCE ORDER

    Поддомкратьте the car also remove the bottom protective casing of the engine. Disconnect каталитический the converter from forward section of an exhaust pipe and turn out bolts of its fastening to a support on a transmission. Lower the car on the earth.
    Disconnect submitting tube from турбокомпрессора and gauge MAF then remove the top cover of the engine (6 and 7 on an illustration).
    Disconnect submitting tube турбокомпрессора (8 on an illustration) from the inlet pipeline and remove a thermofilter (9) турбокомпрессора. Remove the top section of the inlet pipeline (see Has undressed Removal and installation of the inlet pipeline). Remove the storage battery, its pallet and the block of fusible inserts (see the Head of System of an electric equipment of the engine).
    Disconnect from турбокомпрессора каталитический the converter (15 on an illustration).
    Disconnect a vacuum hose (16 on an illustration) from the diaphragm block. Disconnect submitting tube турбокомпрессора from an arm on a transmission and from турбокомпрессора (17 on an illustration).
    Remove with турбокомпрессора an arm of the vacuum block (18 on an illustration), dump pressure in cooling system, and disconnect a water hose from турбокомпрессора (19).
    Disconnect an oil tube турбокомпрессора from the engine block (21 on an illustration) and turn out a hollow bolt (22) tubes. Give fixture (23 on an illustration) and remove турбокомпрессор. Installation is made upside-down. Pay attention to following moments:
      Preliminary make sure that bearings турбокомпрессора are filled by oil. If necessary fill oil through submitting tube турбокомпрессора and turn his hand on enough of turns; Grease fastening hairpins турбокомпрессора with greasing Molycote 1000; Use new sealing rings.