Saab 9-5

Since 1997 of release

Repair and car operation



Saab 9-5
+ Cars Saab 9-5
+ Controls and operation receptions
+ Options and car routine maintenance
+ The engine
+ Systems of cooling of the engine, heating, ventilation and air conditioning
- The power supply system and release of the fulfilled gases
   The general data and security measures
   Sbrasyvanie pressure in fuel system
   + The power supply system of petrol engines
   - The power supply system of diesel engine V6
      The general information
      Removal and installation of a sleeve of an air inlet, the case of the air filter and gauge MAF
      Removal and installation of the inlet pipeline
      Replacement of the gauge of position of a pedal of gas
      Replacement of gauges of a turbo-supercharging and the gauge of temperature of fuel
      Replacement of the valve of management with pressure of pressurisation
      Removal and installation турбокомпрессора
      Removal and installation интеркулера
      Removal and installation of a fuel tank
      Replacement of the fuel filter
      Removal and installation of a fuel distributive highway
      Removal and installation of the gauge of a stock of fuel
      Removal and installation ТНВД and replacement of its epiploon
      Removal and installation of atomizers
   + Systems of release and decrease in toxicity of the fulfilled gases
+ Systems of an electric equipment of the engine
+ Manual box of a gear change
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


https://www.magicalescorts.com/

Removal and installation of atomizers

 PERFORMANCE ORDER

    Remove the top section of the inlet pipeline (see Has undressed Removal and installation of the inlet pipeline). Separate sockets of atomizers, gauges ECT, pressure of pressurisation, CKP, the vacuum tank турбокомпрессора and valve EGR. Remove cable channels from covers of heads of cylinders. Remove the holder of electroconducting from a back head of cylinders and a generator arm. Remove the electroconducting fixed on submitting and returnable fuel lines. Remove tubes of atomizers (see an illustration).
    Remove returnable fuel lines together with arms from a back row of cylinders and take them aside.
    Remove a forward water tube from the inlet pipeline and a head of cylinders (10 on an illustration).
    Remove from a cover of a head of cylinders a ventilation hose картера (11 on an illustration) and remove covers of heads of cylinders (12).
    Remove holders of atomizers (13 on an illustration), and then returnable fuel lines with atomizers (14).
    Installation is made upside-down. Use new consolidations of understanding connections.