Saab 9-5

Since 1997 of release

Repair and car operation



Saab 9-5
+ Cars Saab 9-5
+ Controls and operation receptions
+ Options and car routine maintenance
+ The engine
+ Systems of cooling of the engine, heating, ventilation and air conditioning
+ The power supply system and release of the fulfilled gases
+ Systems of an electric equipment of the engine
+ Manual box of a gear change
+ Automatic transmission
- Coupling and power shafts
   The general information
   - Coupling
      Removal, check and installation of assemblage of coupling
      Removal and installation of a pedal of coupling and its arm
      Removal and installation of the main and executive cylinders
      Prorolling of coupling and its executive cylinder
   + Power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


Removal and installation of the main and executive cylinders

The main cylinder

 PERFORMANCE ORDER

    Remove the bottom left part of the panel of devices (under a steering wheel). Remove from a pedal of coupling a spring, then remove a clamp and take out a pin. Remove the storage battery. On diesel models V6 remove the top thermofilter турбокомпрессора. Clean aside the assembly block of the relay and safety locks in an impellent compartment. Pump out a brake liquid from the prorolling union.
    Disconnect submitting hose (9) from the tank of a brake liquid and separate a socket (10) blocks ABS. Take a socket aside.
    Clear area round connections of brake tubes (13), disconnect them and закупорьте open apertures. Remove block ABS.
    Give fixture and remove arm ABS.
    Remove скобу (16) fastenings of a submitting tube to the main cylinder, disconnect a tube (17) and turn out nuts (18) fastenings of the main cylinder (19).
    Remove the old main cylinder and rearrange a hose (20) on the new cylinder. Installation is made upside-down. After installation pump over coupling (the Section Prorolling of coupling and its executive cylinder see).

The executive cylinder

 PERFORMANCE ORDER

    Remove Manual transmission (the Manual box of a gear change see the Head) and disconnect from the cylinder submitting tube (2).
    Turn out three bolts of fastening (3) executive cylinders and remove it. Grease bolts of fastening of the cylinder with fixing hermetic and fix the cylinder. Establish on the main cylinder submitting tube and pump over it before installation Manual transmission (the Section Prorolling of coupling and its executive cylinder see). Establish Manual transmission and pump over coupling (the Section Prorolling of coupling and its executive cylinder see).