Saab 9-5

Since 1997 of release

Repair and car operation



Saab 9-5
+ Cars Saab 9-5
+ Controls and operation receptions
+ Options and car routine maintenance
+ The engine
+ Systems of cooling of the engine, heating, ventilation and air conditioning
+ The power supply system and release of the fulfilled gases
+ Systems of an electric equipment of the engine
+ Manual box of a gear change
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
- Body
   - The external equipment and кузовные elements
      Removal and installation of bumpers
      Removal and installation of decorative lattices of a radiator
      Removal and installation of spoilers
      Removal and installation of a covering and the decorative panel of a cover of a luggage carrier
      Removal and installation локеров wheel arches
      Removal and installation of forward wings and обтекателя a windscreen
      Removal and installation of beams of the top luggage carrier of models the Versatile person
      Removal and installation of assemblage of the top hatch and its components
      Removal and installation of a cowl and its lock
      Removal, installation, dismantling and assemblage of a forward door and its components
      Removal, installation, dismantling and assemblage of a back door and its components
      Removal, dismantling, assemblage and installation of a door of a back and its components
      Removal and installation of a cover of a luggage carrier and its components
      The fixed glasses
   + The salon equipment
+ Onboard electric equipment


Смотрите на сайте проститутки Калининграда.

Removal and installation of assemblage of the top hatch and its components

Assemblage of the top hatch

 PERFORMANCE ORDER

    Remove a ceiling covering. Remove the console main салонного the fixture, separate a socket of electroconducting of the e/motor of a drive of a cover of the hatch and leave the console to hang on an electroconducting plait.
    Disconnect from unions on assemblage of the hatch of 4 drainage tubes (3).
    Give assemblage fixture, having left one screw on a first line and on the screw in each back corner of assemblage (4,5). Then together with the assistant, turn out these remained screws and remove assemblage of the top hatch. Installation is made upside-down. In summary check up serviceability of functioning of the hatch.

Cover of the hatch and the e/motor of its drive

 PERFORMANCE ORDER

    Open the hatch and turn out overlay screws on a forward part of its cover (2).
    Close the hatch and lift its back part. Pull for back edge of a cover back to unhook its overlay from clamps (4).
    Remove from clamps lateral overlays (5), lift a back part of a cover of the hatch, turn out two bolts (7) and uncover.

At e/motor removal to turn out screws and it is not necessary to uncover, it is enough to remove overlays.


    Close the hatch and make sure that sliding support are located between labels on the directing.

At installation of the new motor the hatch should be closed, since the motor is delivered in this position.

    Remove sun-protection peaks and separate a socket of electroconducting of illumination of a mirror. Remove рассеиватель салонного the fixture, turn out screws and remove the ceiling console. Remove an internal rear-view mirror.
    Turn out bolts of fastening of the e/motor (10), then accurately unbend a covering of a ceiling and remove the e/motor, having separated its electroconducting (11).
    Installation is made upside-down. Before a tightening of fixture of the e/motor move it to be convinced of gearing of gear wheels of a drive. A hatch cover level with a roof. The arrangement of a first line a little below back edge is supposed.