Saab 9-5

Since 1997 of release

Repair and car operation



Saab 9-5
+ Cars Saab 9-5
+ Controls and operation receptions
+ Options and car routine maintenance
- The engine
   The general information and preparatory operations
   Check компрессионного pressure
   Check of the engine by means of the vacuum gauge
   + Repair of 4-cylinder petrol engines
   - Repair of 6-cylinder petrol engines
      Reduction of the piston of the first cylinder in position ВМТ and replacement of a belt of a drive of auxiliary units and it натяжителя
      Removal and installation of the inlet pipeline, belt of drive ГРМ and heads of cylinders
      Dismantling and assemblage клапанного the mechanism
      Replacement of epiploons of a cranked shaft
      Removal and pallet installation картера and маслоотражательной plates
      Replacement of the oil pump and its valves
      Replacement перепускного the valve of system of greasing of the engine
      Removal and installation of the power unit
   + Repair of 6-cylinder diesel engines
+ Systems of cooling of the engine, heating, ventilation and air conditioning
+ The power supply system and release of the fulfilled gases
+ Systems of an electric equipment of the engine
+ Manual box of a gear change
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


Replacement of epiploons of a cranked shaft

Forward epiploon

 PERFORMANCE ORDER

    Result the piston of the first cylinder in position ВМТ of the end of a step of compression (see Has undressed Reduction of the piston of the first cylinder in position ВМТ and replacement of a belt of a drive of auxiliary units and it натяжителя). Give fixture tension and adjusting rollers (see Has undressed Removal and installation of the inlet pipeline, a belt of drive ГРМ and heads of cylinders). Mark a direction of movement of a belt of drive ГРМ, and also its position concerning cogwheels. Remove adaptation KM-800-10 from a cranked shaft, having left fixing adaptations on camshafts. Remove the bottom adjusting roller and a washer located behind it. Remove a belt of drive ГРМ. Turn a cranked shaft in position 60 hailstones. To ВМТ and поддомкратьте the car.
    Keeping by means of the special adaptation a cogwheel of a cranked shaft, give its fixture and remove a cogwheel together with the prorate (19 on an illustration).
    Accurately take an epiploon (20 on an illustration), trying not to damage an interfaced surface. Grease a new epiploon, establish it on a cranked shaft and запрессуйте by means of the special adaptation or a piece of a pipe of suitable diameter. Establish the prorate and a cogwheel of a cranked shaft. Lower the car on the earth. Establish a belt of drive ГРМ and adjust its tension as Removal and installation of the inlet pipeline, a belt of drive ГРМ and heads of cylinders is described in Section. The further installation is made in an order, the return sequence of dismantle of components.

Back epiploon

 PERFORMANCE ORDER

    Depending on a complete set remove RKPP/AT and a flywheel/privodnoj a disk (the Manual box of a gear change or Automatic transmission see the Head). Accurately take an epiploon (3 on an illustration).
Removal (3) and installation (5) back epiploons.

Damage of an interfaced surface of the block of cylinders is not supposed.

    Grease with impellent oil sealing edges of a new epiploon and запрессуйте it into place by means of special adaptations (5 on an illustration). Establish a flywheel/privodnoj a disk and RKPP/AT (depending on a complete set).