Saab 9-5

Since 1997 of release

Repair and car operation



Saab 9-5
+ Cars Saab 9-5
+ Controls and operation receptions
+ Options and car routine maintenance
+ The engine
+ Systems of cooling of the engine, heating, ventilation and air conditioning
+ The power supply system and release of the fulfilled gases
+ Systems of an electric equipment of the engine
- Manual box of a gear change
   Transmission identification
   The general information
   Removal and installation of a casing of the lever of a gear change
   Adjustment, removal and installation of a drive of a gear change and the ignition lock
   Replacement of the handle of the lever of a gear change
   Removal and installation Manual transmission of 4-cylinder engines
   Removal and installation Manual transmission of diesel engines V6
   Removal and installation Д/В of lanterns of a backing
   Replacement of epiploons of power shafts
   Design and transmission major repairs
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


Removal and installation Д/В of lanterns of a backing

 PERFORMANCE ORDER

    The gauge site is specified in illustrations (№14). Disconnect a negative wire from the storage battery. Separate a socket of the gauge and turn out it. Collect gauge consolidations. Installation is made upside-down.