Saab 9-5
Since 1997 of release
Repair and car operation
Saab 9-5
+
Cars Saab 9-5
+
Controls and operation receptions
+
Options and car routine maintenance
+
The engine
+
Systems of cooling of the engine, heating, ventilation and air conditioning
-
The power supply system and release of the fulfilled gases
The general data and security measures
Sbrasyvanie pressure in fuel system
-
The power supply system of petrol engines
Principle of functioning of a control system of fuel injection
Removal and installation of a sleeve of an air inlet and the case of the air filter
Removal and installation of gauges MAF, MAP, IAT and the gauge of temperature/pressure of air of pressurisation
Removal and installation of a tube of forced air
Removal and installation of the case of a throttle
Removal and installation of the control valve of forced air
Removal and installation
перепускного the
valve
турбокомпрессора
Removal and installation
турбокомпрессора
Removal and installation
интеркулера
Removal and installation of a pedal of gas, adjustment of a cable of a drive throttle
заслонки
Removal and installation of a fuel tank
Replacement of the fuel filter
Removal and installation of assemblage of the fuel pump and the gauge of a stock of fuel
Removal and installation of a fuel distributive highway and injectors
Removal and installation of a regulator of pressure of fuel
+
The power supply system of diesel engine V6
+
Systems of release and decrease in toxicity of the fulfilled gases
+
Systems of an electric equipment of the engine
+
Manual box of a gear change
+
Automatic transmission
+
Coupling and power shafts
+
Brake system
+
Suspension bracket and steering
+
Body
+
Onboard electric equipment
Removal and installation of the control valve of forced air
PERFORMANCE ORDER
Remove a protective rubber casing and separate a valve socket (1 on an illustration).
Mark hoses and disconnect them from the valve, then from an arm. Installation is made upside-down, do not mix a place of connection of hoses.