Saab 9-5

Since 1997 of release

Repair and car operation



Saab 9-5
+ Cars Saab 9-5
+ Controls and operation receptions
+ Options and car routine maintenance
- The engine
   The general information and preparatory operations
   Check компрессионного pressure
   Check of the engine by means of the vacuum gauge
   - Repair of 4-cylinder petrol engines
      Reduction of the piston of the first cylinder in position of the top dead point (ВМТ)
      Removal and installation of a head of cylinders and натяжителя приводной chains
      Removal and installation of camshafts and valves, estimation клапанных backlashes
      Check and replacement приводной chains
      Replacement of a belt of a drive of auxiliary units
      Replacement of epiploons and pulley of a cranked shaft
      Replacement of the oil pump
      Removal and pallet installation картера
      Removal and installation of an arm of the filter, the thermostat and редукционного the valve of system of greasing of the engine
      Check of pressure of impellent oil
      Removal and installation of the power unit
      Removal and installation of a cover of drive ГРМ
      Check and replacement of a chain of a drive of balancing shaft and their asterisks
   + Repair of 6-cylinder petrol engines
   + Repair of 6-cylinder diesel engines
+ Systems of cooling of the engine, heating, ventilation and air conditioning
+ The power supply system and release of the fulfilled gases
+ Systems of an electric equipment of the engine
+ Manual box of a gear change
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


Replacement of epiploons and pulley of a cranked shaft

Forward epiploon

 PERFORMANCE ORDER

    Поддомкратьте the car also establish it on props. Remove the right forward wheel. Remove a belt of a drive of auxiliary units (the Section Replacement of a belt of a drive of auxiliary units see).
    Remove the bottom cover of a flywheel and block rotation of a flywheel by means of the special adaptation.
    Turn out a bolt of fastening of a pulley of a cranked shaft (6) and accurately take a screw-driver an old epiploon (7).

Do not damage the surface of the oil pump interfaced to an epiploon.

    Establish a new epiploon by means of the special adaptation or a piece of a pipe of suitable diameter. The further installation is made in an order, the return sequence of dismantle of components. In end start the engine, allow to it to work idling. Muffle the engine and check up presence of leaks through an epiploon.

Back epiploon

 PERFORMANCE ORDER

    Remove Manual transmission or АТ, depending on model (the Manual box of a gear change or Automatic transmission see the Head). On models with Manual transmission remove coupling and a persistent plate (Coupling and power shafts see the Head). Remove a flywheel or приводной a disk. Accurately take a screw-driver an old epiploon.

Do not damage a surface interfaced to an epiploon.


    Запрессуйте a new epiploon by means of the special adaptation (1 on an illustration), established on cranked to a shaft.
    Installation is made upside-down. Tighten fixture with demanded efforts.