Saab 9-5

Since 1997 of release

Repair and car operation



Saab 9-5
+ Cars Saab 9-5
+ Controls and operation receptions
+ Options and car routine maintenance
- The engine
   The general information and preparatory operations
   Check компрессионного pressure
   Check of the engine by means of the vacuum gauge
   - Repair of 4-cylinder petrol engines
      Reduction of the piston of the first cylinder in position of the top dead point (ВМТ)
      Removal and installation of a head of cylinders and натяжителя приводной chains
      Removal and installation of camshafts and valves, estimation клапанных backlashes
      Check and replacement приводной chains
      Replacement of a belt of a drive of auxiliary units
      Replacement of epiploons and pulley of a cranked shaft
      Replacement of the oil pump
      Removal and pallet installation картера
      Removal and installation of an arm of the filter, the thermostat and редукционного the valve of system of greasing of the engine
      Check of pressure of impellent oil
      Removal and installation of the power unit
      Removal and installation of a cover of drive ГРМ
      Check and replacement of a chain of a drive of balancing shaft and their asterisks
   + Repair of 6-cylinder petrol engines
   + Repair of 6-cylinder diesel engines
+ Systems of cooling of the engine, heating, ventilation and air conditioning
+ The power supply system and release of the fulfilled gases
+ Systems of an electric equipment of the engine
+ Manual box of a gear change
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


Replacement of the oil pump

 PERFORMANCE ORDER

    Remove a pulley of a cranked shaft (the Section Replacement of epiploons and a pulley of a cranked shaft see).
    Remove and clear a lock ring of the oil pump.
    By means of big захватных pincers uncover the oil pump and take its rotors.

At removal remember an arrangement of labels on a cover and on gear wheels that then to establish them in a starting position.

Installation is made upside-down. Preliminary grease rotors with impellent oil. Tighten fixture with demanded efforts.